LeanMan Lean Principles Advanced Trainer

$1,409.61

 

Save over $100 on this combination package of the LM Kanban Simulation, VSMgt Value Stream and Heijunka methods in a Customer-Pull process, packaged in a convenient travel case.

Package Contents:

Packaged into a LeanMan To Go Roll Along Travel Case are the following items:

  • Deluxe Plus Kanban Lean Factory Simulation Car Kit
  • Heijunka Upgrade to the Deluxe Package
  • VSMgt Simulation on CD
  • 8-Wastes NVA Activity Wallet Cards (50 pack)
  • Large Digit easy to read solar calculator

For individual product details, please see their descriptions in the Product Catalog on this web site.

This product is no longer available.

LeanMan Lean Principles Advanced Trainer

The Advanced Trainer Simulation Kit is not a stock item. This special order requires 2 weeks to manufacture after order is received.

PRODUCT DESCRIPTION

The Advanced Trainer combines the most popular LeanMan Lean Principles flow simulation training products into one package, complete with travel case and solar powered large digit metrics calculator, and all at a special low price.

The package includes a Deluxe Plus Kanban Lean Car Factory Kit container with all of its content and simulation events; plus a LM Heijunka Upgrade Kit container with the unique Heijunka Box and all of its materials, simulation events, and special items. The LM Kanban Simulation materials added to the Deluxe Kit provides everything needed to fully explore the Kanban pull-system, which is a complete supplier to customer Value Stream simulation with heijunka kanban control, kaizen and bottom line financial metrics.

The Deluxe Plus Kanban Simulation Package consists of the combination of two great product offerings: The Deluxe Car Factory Kit presents the five principles of Lean Manufacturing through comprehensive lecture presentations and hands-on simulations. The LM Kanban Simulation Upgrade Materials provide the additional facilitator guide and car factory materials needed to perform the kanban customer-pull simulation with kanban control. Check out the Deluxe Plus Kanban Simulation Package full Value Stream lean training event.

The Heijunka Upgrade - Heijunka Simulation provides a look at the influences of Push versus Sequenced flow and inventory buffers at each point processes along the door-to-door value stream when implementing heijunka planning and kanban control. Check out the Heijunka Flow - a full scale lean training event.

The VSMgt Service and Repair Center Simulation - Value Stream Simulation provides additional simulation materials to perform the Service Center value stream simulation with focus on the administration and customer interface side of operations. While not as comprehensive as the full VSM product, it does provide an alternative look at a door-to-door flow. Check out the VSMgt Simulation Flow - an alternate full value stream lean training event.

8-Waste NVA Activity Cards help in identifying and then eliminating the 8 wastes are the keys to workplace productivity. This 50-pack of handy wallet-size cards are great to let the team keep with them as a reminder of the 8 Wastes. Check out the 8-Waste NVA Cards - they help keep the principles alive.

The LeanMan To Go Roll-Along Case features patented one-touch release telescoping handle and built-in wheels for easy roll-along transport and retracts for easy carrying. Has room inside for the two Car Factory Simulation Kits, Game CD, and all of the facilitator’s guide books and participant placemat sets.

Compatible Simulations

The LeanMan suggests using the LeanMan Lean Principles Advanced Trainer in the following simulations:

Learning to See the Waste

This executive level 2-Step simulation is the simplest event to run but packs a big WOW factor. It requires just one Car Factory Kit per team. Plus, with the laminated participant instruction placemats, it's so easy to perform that single person can easily facilitate five or more teams, making it great for large audiences and conventions.

  • Group Size: 5-8
  • Duration: 100 min.
  • Steps: 2
Car Factory Simulation

This 4-step simulation uses one Car Factory Kit per team, and a single facilitator can easily run 2 or 3 teams in parallel for a little competition and metrics comparison. This simulation event is also provided as an editable set of files on the USB drive that allow customization to the facilitator's specific target training needs.

  • Group Size: 5-8
  • Duration: 100 min.
  • Steps: 4
TPS Simulation

The Toyota Production System (TPS) simulation is a 5-step event which uses the training methods generally recognized as the Toyota method for introducing lean flow. This method focus more on flow and eliminating process waste and less on reducing the number of human elements in the process.

  • Group Size: 8-12
  • Duration: 110 min.
  • Steps: 5
Kanban Simulation

This four-step Customer-Pull event explores the flow control differences between a single kanban card and dual kanban card replenishment system with random demand in a full value stream simulation.

  • Group Size: 8-12
  • Duration: 260 min.
  • Steps: 4